Officials are meeting with approximately 150 southwest side homeowners to discuss connecting to the new water line constructed in the village’s Adams Heights section.
Village plans call for shutting down the current water line on Nov. 1, according to Village President Lou Sherman, who wants residents to connect to a new 6-inch line in October.
The new pipe will provide better water quality and pressure than the current 2-inch pipe, which Sherman describes as “old, with numerous breaks.”
Still some residents are less than enthusiastic about paying $1,500 to $5,000 to connect to the new line.
Price is based on distance from the line.